Cloud migration and hybrid

Few organisations start in the cloud; most move there, one system at a time, and run a hybrid estate for years along the way. Migration is the discipline of deciding what to rehost as it is, what to adapt and what to rebuild, and of keeping the business running while the ground shifts. The hosting guides cover moving a single site; this topic covers moving an organisation.

Why this topic exists: Moving existing workloads (rehost, replatform, refactor) and running hybrid estates is a large part of enterprise cloud work, and the architect exams test it; the hosting guides cover the small end of a move.

Moving an estate while it keeps running

Cloud migration is the planned transfer of existing systems from servers an organisation owns or rents onto a cloud platform, usually in waves and rarely all at once. For a long stretch the estate is hybrid: some systems have moved, others wait, and the network, identity and data links between the two halves must behave as if nothing had changed. The job combines inventory work, architecture, project management and a good deal of negotiation with the people who own each application.

ApproachWhat changesWhere it fits
RehostNothing inside the application; the machine is recreated at the providerFixed exit dates, data-centre closures, software nobody can modify
ReplatformA few components swapped for managed equivalents, such as the databaseSystems that work well but carry needless upkeep
RefactorThe design itself, often towards containers, functions or managed messagingApplications worth investing in that their old shape holds back

What the blueprints expect

AWS's professional architect exam, SAP-C02, gives migration and modernisation a domain of its own. Its task statements cover portfolio assessment, wave planning, total cost of ownership, choosing transfer tools for applications, databases and bulk data, and judging each application against seven common migration strategies before deciding where decoupling or serverless designs could replace the old shape. The associate exam is lighter but still asks when to move an application into containers, how to shift a database to the same or a different engine, and how to make legacy software more reliable when its code cannot change. Microsoft's AZ-305 folds migration into infrastructure design, from evaluating on-premises servers and data to recommending routes for workloads, databases and unstructured data, while AZ-900 asks only that candidates know what Azure Migrate and Data Box are for. Google's Professional Cloud Architect covers migration planning on its own platform.

  • Hidden dependencies: an application moved without the file share, batch job or licence server it quietly relied on.
  • Heavy data: large databases take longest to move and are hardest to keep in step during the cut-over.
  • Network and identity: hybrid links, DNS and directory integration must exist before the first wave, not during it; see cloud networking.
  • Cost surprise: a server rehosted at its old size keeps its old waste and adds a meter.
  • Skills: operations staff asked to run a platform nobody has trained them on.

The beginner's error is to treat migration as a technical copy job. The hard questions are which systems should move at all, which should be switched off, and whether a managed hosting service would serve better than a cloud estate the organisation must run itself. At the small end, moving a site from a VPS or a dedicated server to cloud hosting follows the same logic in miniature, and our guide to site migration without downtime walks through it. Before migrating anything larger, settle the target structure in governance and landing zones.

Next to this topic

Concepts to know

Glossary entries with the reason each one matters here.

  • Cloud Hosting

    The small end of migration: moving a site onto cloud hosting.

  • VPS

    What most small workloads migrate from.

  • Managed Hosting

    The alternative to migrating at all.

  • Dedicated Server

    The on-premises-like starting point of many enterprise migrations.

Certifications that test it

Vendor exams and free certificates; facts, cost and the preparation path are on each page, and the certifications hub has them all.

Guides that apply

Frequently asked

Is rehosting a bad idea?
Not in itself. It is often the quickest way to leave a data centre by a fixed date, and improvements can follow once the system runs in the cloud. It becomes a problem when the follow-up never happens and the organisation pays cloud rates for an unchanged design.
How long does an enterprise migration take?
That depends on the size and tangle of the estate, and no honest general figure exists. Plan in waves, complete a small, low-risk wave first, and use what it teaches you to estimate the rest.
What does hybrid mean in practice?
Running some systems in the cloud and some on premises, joined by private network links, shared identity and data flows, for as long as the organisation needs. For many it is a lasting arrangement rather than a phase.

Courses in the directory

8 courses are filed here; the top 6 by our ranking, details and the provider link on each course page.

Browse the directory shelf